This project includes a state of competition pool and spa. The 50 meter competition pool is constructed with PVC laminated stainless steel technology and has dual bulkheads, two (2) 3 meter diving boards, two (2) 1 meter diving boards, state of the art timing system and display board and substantial spectator seating. There is an adjacent spa constructed of tile lined PVC laminated spa technology and has an ADA transfer wall, perimeter bench seating and multiple hydrotherapy jets.