Big Piney High School, Big Piney, Wyoming
Renovation of an existing 20 year old shotcrete swimming pool to increase maximum depth of pool from 3.5 feet to 5 feet to allow competition swimming starts from a starting block. The scope of work also included the separation of the existing wading pool from the circulation system and refinishing all of the pools in the project.